GSA CHILLER REPLACEMENT

open gallery

Upgrade to Multistack 160 Ton Chiller

  • GSA
  • Washington, DC
  • $316,000
  • 90 Days
  • 238220

Project Description

The primary requirement of this project was to replace a defective chiller at the National Building Museum in Washington DC. The defective chiller was removed and ultimately replaced with a multi-stack 160 ton chiller. Installation of the new unit included:

  1. Mounting on elastomeric pads
  2. Fitting with existing condenser and chilled water pumps.
  3. Incorporation with existing Building Management System.
  4. Testing, adjusting, and balancing.