Upgrade to Multistack 160 Ton Chiller
- GSA
- Washington, DC
- $316,000
- 90 Days
- 238220
Project Description
The primary requirement of this project was to replace a defective chiller at the National Building Museum in Washington DC. The defective chiller was removed and ultimately replaced with a multi-stack 160 ton chiller. Installation of the new unit included:
- Mounting on elastomeric pads
- Fitting with existing condenser and chilled water pumps.
- Incorporation with existing Building Management System.
- Testing, adjusting, and balancing.